{"id":20944,"date":"2022-11-04T09:40:22","date_gmt":"2022-11-04T08:40:22","guid":{"rendered":"https:\/\/www.ades-grenoble.org\/wordpress\/?p=20944"},"modified":"2022-11-04T11:28:08","modified_gmt":"2022-11-04T10:28:08","slug":"la-crise-du-logement-neuf-se-poursuit-mois-apres-mois-2","status":"publish","type":"post","link":"https:\/\/www.ades-grenoble.org\/wordpress\/2022\/11\/04\/la-crise-du-logement-neuf-se-poursuit-mois-apres-mois-2\/","title":{"rendered":"La crise du logement neuf se poursuit mois apr\u00e8s mois"},"content":{"rendered":"<div class=\"wp-block-image is-style-default\">\n<figure class=\"alignleft size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"380\" height=\"320\" src=\"https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/08\/MinistereEcologueTransition.jpg\" alt=\"\" class=\"wp-image-20617\" srcset=\"https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/08\/MinistereEcologueTransition.jpg 380w, https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/08\/MinistereEcologueTransition-300x253.jpg 300w, https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/08\/MinistereEcologueTransition-150x126.jpg 150w\" sizes=\"auto, (max-width: 380px) 100vw, 380px\" \/><\/figure>\n<\/div>\n\n\n<p><a href=\"https:\/\/www.statistiques.developpement-durable.gouv.fr\/publicationweb\/498\" target=\"_blank\" rel=\"noreferrer noopener\">Fin septembre 2022, il n\u2019y a toujours pas de red\u00e9marrage de la construction de logements neufs<\/a>, notamment les logements collectifs stagnent toujours. Il y a toujours un grand gap entre les autorisations et les mises en construction. Jusqu\u2019\u00e0 une p\u00e9riode r\u00e9cente, il y avait un rapport de 1,14 entre autorisation et mise en construction, actuellement ce rapport est de 1,36.<\/p>\n\n\n\n<p>Les mises en chantier de logements collectifs et en r\u00e9sidence sont estim\u00e9es en baisse de 9&nbsp;300&nbsp;unit\u00e9s (-&nbsp;4,1&nbsp;%) par rapport aux 12&nbsp;mois pr\u00e9c\u00e9dents, les logements collectifs ordinaires (-&nbsp;3,7&nbsp;%) et les logements en r\u00e9sidence (-&nbsp;6,6&nbsp;%).<\/p>\n\n\n\n<!--more-->\n\n\n\n<p><em>\u00ab\u00a0Au troisi\u00e8me trimestre 2022, les logements autoris\u00e9s sont en baisse (-\u00a02,0\u00a0%) par rapport au trimestre pr\u00e9c\u00e9dent, o\u00f9 ils avaient connu une plus forte diminution (-\u00a09,9\u00a0%), en donn\u00e9es corrig\u00e9es des variations saisonni\u00e8res et des jours ouvrables (CVS-CJO). Le nombre de logements autoris\u00e9s au cours des trois derniers mois est sup\u00e9rieur (+\u00a09,3\u00a0%) \u00e0 la moyenne des 12\u00a0mois pr\u00e9c\u00e9dant la crise sanitaire (mars 2019 \u00e0 f\u00e9vrier 2020). L\u2019effet du nombre exceptionnel de demandes de permis d\u00e9pos\u00e9es en d\u00e9cembre 2021 s&rsquo;estompe pour les logements collectifs ou en r\u00e9sidence.<br><br>Au troisi\u00e8me trimestre 2022, on estime que les logements commenc\u00e9s ont augment\u00e9 (+\u00a01,4\u00a0%) par rapport au deuxi\u00e8me trimestre, o\u00f9 ils \u00e9taient en baisse (-\u00a05,3\u00a0%), en donn\u00e9es CVS-CJO. Au cours de ces trois mois, on estime que les mises en chantier de logements ont \u00e9t\u00e9 inf\u00e9rieures (-\u00a01,7\u00a0%) \u00e0 leur moyenne des 12\u00a0mois pr\u00e9c\u00e9dant le premier confinement.<br><br>D&rsquo;octobre 2021 \u00e0 septembre 2022, 512\u00a0400\u00a0logements ont \u00e9t\u00e9 autoris\u00e9s \u00e0 la construction, soit 46\u00a0600 de plus qu\u2019au cours des 12\u00a0mois pr\u00e9c\u00e9dents (+\u00a010,0\u00a0%). Dans le m\u00eame temps, on estime que 386\u00a0000\u00a0logements ont \u00e9t\u00e9 mis en chantier, soit 1\u00a0700 de plus (+\u00a00,4\u00a0%) que lors des 12\u00a0mois pr\u00e9c\u00e9dents (octobre 2020 \u00e0 septembre 2021). Si on prend comme point de comparaison les 12\u00a0mois pr\u00e9c\u00e9dant la crise sanitaire (mars 2019 \u00e0 f\u00e9vrier 2020), les nombres de logements autoris\u00e9s et commenc\u00e9s au cours des 12\u00a0derniers mois sont sup\u00e9rieurs de respectivement 11,5\u00a0% et 0,6\u00a0%.\u00a0\u00bb<\/em><\/p>\n\n\n<div class=\"wp-block-image is-style-default\">\n<figure class=\"aligncenter size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"516\" src=\"https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/11\/logements-neufs.jpg\" alt=\"\" class=\"wp-image-20946\" srcset=\"https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/11\/logements-neufs.jpg 800w, https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/11\/logements-neufs-300x194.jpg 300w, https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/11\/logements-neufs-150x97.jpg 150w, https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/11\/logements-neufs-768x495.jpg 768w, https:\/\/www.ades-grenoble.org\/wordpress\/wp-content\/uploads\/2022\/11\/logements-neufs-600x387.jpg 600w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/figure>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Fin septembre 2022, il n\u2019y a toujours pas de red\u00e9marrage de la construction de logements neufs, notamment les logements collectifs stagnent toujours. Il y a toujours un grand gap entre les autorisations et les mises en construction. Jusqu\u2019\u00e0 une p\u00e9riode r\u00e9cente, il y avait un rapport de 1,14 entre autorisation et mise en construction, actuellement [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"twitterCardType":"","cardImageID":0,"cardImage":"","cardTitle":"","cardDesc":"","cardImageAlt":"","cardPlayer":"","cardPlayerWidth":0,"cardPlayerHeight":0,"cardPlayerStream":"","cardPlayerCodec":"","footnotes":""},"categories":[62,11],"tags":[104,298,294,66],"class_list":["post-20944","post","type-post","status-publish","format-standard","hentry","category-le-rouge-le-vert-hebdo","category-politique-locale","tag-economie","tag-france","tag-immobilier","tag-logement"],"_links":{"self":[{"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/posts\/20944","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/comments?post=20944"}],"version-history":[{"count":1,"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/posts\/20944\/revisions"}],"predecessor-version":[{"id":20947,"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/posts\/20944\/revisions\/20947"}],"wp:attachment":[{"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/media?parent=20944"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/categories?post=20944"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.ades-grenoble.org\/wordpress\/wp-json\/wp\/v2\/tags?post=20944"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}